Triple

T20224579
Position Surface form Disambiguated ID Type / Status
Subject Hardy Dam Pond E495343 entity
Predicate partOf P40 FINISHED
Object Consumers Energy hydroelectric project on Muskegon River NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Consumers Energy hydroelectric project on Muskegon River | Statement: [Hardy Dam Pond, partOf, Consumers Energy hydroelectric project on Muskegon River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Consumers Energy hydroelectric project on Muskegon River
Context triple: [Hardy Dam Pond, partOf, Consumers Energy hydroelectric project on Muskegon River]
  • A. Marquette Board of Light and Power hydroelectric facilities
    The Marquette Board of Light and Power hydroelectric facilities are a set of power-generating plants in Michigan that harness river flow to produce electricity for the Marquette area’s municipal utility system.
  • B. Escanaba Hydroelectric Project
    The Escanaba Hydroelectric Project is a hydroelectric power facility on Michigan’s Escanaba River that generates electricity by harnessing the river’s flow.
  • C. Beaver Dam Hydroelectric Plant
    Beaver Dam Hydroelectric Plant is a hydroelectric power facility in Arkansas that generates electricity using water impounded by Beaver Lake on the White River.
  • D. Oak Grove Hydroelectric Project
    Oak Grove Hydroelectric Project is a hydroelectric power facility in Oregon that generates electricity by harnessing the flow of the Oak Grove Fork of the Clackamas River.
  • E. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Consumers Energy hydroelectric project on Muskegon River
Target entity description: The Consumers Energy hydroelectric project on the Muskegon River is a power-generating system of dams and reservoirs, including Hardy Dam Pond, that produces renewable electricity while providing recreational and water management benefits in western Michigan.
  • A. Marquette Board of Light and Power hydroelectric facilities
    The Marquette Board of Light and Power hydroelectric facilities are a set of power-generating plants in Michigan that harness river flow to produce electricity for the Marquette area’s municipal utility system.
  • B. Escanaba Hydroelectric Project
    The Escanaba Hydroelectric Project is a hydroelectric power facility on Michigan’s Escanaba River that generates electricity by harnessing the river’s flow.
  • C. Beaver Dam Hydroelectric Plant
    Beaver Dam Hydroelectric Plant is a hydroelectric power facility in Arkansas that generates electricity using water impounded by Beaver Lake on the White River.
  • D. Oak Grove Hydroelectric Project
    Oak Grove Hydroelectric Project is a hydroelectric power facility in Oregon that generates electricity by harnessing the flow of the Oak Grove Fork of the Clackamas River.
  • E. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626cff80819097b530718a7c98b6 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e66fd8f1948190adbb947a7870bb43 completed April 20, 2026, 6:26 p.m.
Created at: April 11, 2026, 11:39 p.m.