Triple
T20224579
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hardy Dam Pond |
E495343
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Consumers Energy hydroelectric project on Muskegon River |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Consumers Energy hydroelectric project on Muskegon River | Statement: [Hardy Dam Pond, partOf, Consumers Energy hydroelectric project on Muskegon River]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Consumers Energy hydroelectric project on Muskegon River Context triple: [Hardy Dam Pond, partOf, Consumers Energy hydroelectric project on Muskegon River]
-
A.
Marquette Board of Light and Power hydroelectric facilities
The Marquette Board of Light and Power hydroelectric facilities are a set of power-generating plants in Michigan that harness river flow to produce electricity for the Marquette area’s municipal utility system.
-
B.
Escanaba Hydroelectric Project
The Escanaba Hydroelectric Project is a hydroelectric power facility on Michigan’s Escanaba River that generates electricity by harnessing the river’s flow.
-
C.
Beaver Dam Hydroelectric Plant
Beaver Dam Hydroelectric Plant is a hydroelectric power facility in Arkansas that generates electricity using water impounded by Beaver Lake on the White River.
-
D.
Oak Grove Hydroelectric Project
Oak Grove Hydroelectric Project is a hydroelectric power facility in Oregon that generates electricity by harnessing the flow of the Oak Grove Fork of the Clackamas River.
-
E.
Cushman Hydroelectric Project
The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Consumers Energy hydroelectric project on Muskegon River Target entity description: The Consumers Energy hydroelectric project on the Muskegon River is a power-generating system of dams and reservoirs, including Hardy Dam Pond, that produces renewable electricity while providing recreational and water management benefits in western Michigan.
-
A.
Marquette Board of Light and Power hydroelectric facilities
The Marquette Board of Light and Power hydroelectric facilities are a set of power-generating plants in Michigan that harness river flow to produce electricity for the Marquette area’s municipal utility system.
-
B.
Escanaba Hydroelectric Project
The Escanaba Hydroelectric Project is a hydroelectric power facility on Michigan’s Escanaba River that generates electricity by harnessing the river’s flow.
-
C.
Beaver Dam Hydroelectric Plant
Beaver Dam Hydroelectric Plant is a hydroelectric power facility in Arkansas that generates electricity using water impounded by Beaver Lake on the White River.
-
D.
Oak Grove Hydroelectric Project
Oak Grove Hydroelectric Project is a hydroelectric power facility in Oregon that generates electricity by harnessing the flow of the Oak Grove Fork of the Clackamas River.
-
E.
Cushman Hydroelectric Project
The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626cff80819097b530718a7c98b6 |
completed | April 11, 2026, 3:02 p.m. |
| NER | Named-entity recognition | batch_69e66fd8f1948190adbb947a7870bb43 |
completed | April 20, 2026, 6:26 p.m. |
Created at: April 11, 2026, 11:39 p.m.