Triple
T20222514
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Neuchâtel railway station |
E495291
|
entity |
| Predicate | railwayLine |
P848
|
FINISHED |
| Object | Biel/Bienne–Neuchâtel line |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Biel/Bienne–Neuchâtel line | Statement: [Neuchâtel railway station, railwayLine, Biel/Bienne–Neuchâtel line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Biel/Bienne–Neuchâtel line Context triple: [Neuchâtel railway station, railwayLine, Biel/Bienne–Neuchâtel line]
-
A.
La Chaux-de-Fonds–Glovelier line
The La Chaux-de-Fonds–Glovelier line is a regional railway route in the Jura region of Switzerland that connects the watchmaking city of La Chaux-de-Fonds with Glovelier through several small towns and rural areas.
-
B.
Neuchâtel–La Chaux-de-Fonds line
The Neuchâtel–La Chaux-de-Fonds line is a Swiss standard-gauge railway route connecting the city of Neuchâtel with the watchmaking center of La Chaux-de-Fonds in the Jura region.
-
C.
Bern–Olten line
The Bern–Olten line is a major Swiss railway corridor connecting the capital Bern with the important rail hub of Olten, forming part of the country’s primary east–west transit axis.
-
D.
Yverdon–Neuchâtel railway line
The Yverdon–Neuchâtel railway line is a standard-gauge rail route in western Switzerland that connects the towns of Yverdon-les-Bains and Neuchâtel along the southern shore of Lake Neuchâtel.
-
E.
Bern–Neuchâtel railway line
The Bern–Neuchâtel railway line is a key Swiss standard-gauge route connecting the federal city of Bern with Neuchâtel, serving both regional and intercity passenger traffic.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Biel/Bienne–Neuchâtel line Target entity description: The Biel/Bienne–Neuchâtel line is a key standard-gauge railway route in western Switzerland that connects the bilingual city of Biel/Bienne with Neuchâtel along the Jura region.
-
A.
La Chaux-de-Fonds–Glovelier line
The La Chaux-de-Fonds–Glovelier line is a regional railway route in the Jura region of Switzerland that connects the watchmaking city of La Chaux-de-Fonds with Glovelier through several small towns and rural areas.
-
B.
Neuchâtel–La Chaux-de-Fonds line
The Neuchâtel–La Chaux-de-Fonds line is a Swiss standard-gauge railway route connecting the city of Neuchâtel with the watchmaking center of La Chaux-de-Fonds in the Jura region.
-
C.
Bern–Olten line
The Bern–Olten line is a major Swiss railway corridor connecting the capital Bern with the important rail hub of Olten, forming part of the country’s primary east–west transit axis.
-
D.
Yverdon–Neuchâtel railway line
The Yverdon–Neuchâtel railway line is a standard-gauge rail route in western Switzerland that connects the towns of Yverdon-les-Bains and Neuchâtel along the southern shore of Lake Neuchâtel.
-
E.
Bern–Neuchâtel railway line
The Bern–Neuchâtel railway line is a key Swiss standard-gauge route connecting the federal city of Bern with Neuchâtel, serving both regional and intercity passenger traffic.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626cff80819097b530718a7c98b6 |
completed | April 11, 2026, 3:02 p.m. |
| NER | Named-entity recognition | batch_69e66fd729548190942bcf842f03c4cd |
completed | April 20, 2026, 6:26 p.m. |
Created at: April 11, 2026, 11:39 p.m.