Triple
T20217743
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mario Kart 7 |
E495172
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Mario Kart series entry |
C13429
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Mario Kart series entry Context triple: [Mario Kart 7, instanceOf, Mario Kart series entry]
-
A.
Mario Kart series installment
chosen
A Mario Kart series installment is a racing video game entry featuring Nintendo characters competing in go-kart races across themed tracks with items, hazards, and multiplayer modes.
-
B.
Mario Kart race track
A Mario Kart race track is a themed, looping course filled with obstacles, shortcuts, and interactive elements where players compete in kart races using items to gain advantages or hinder opponents.
-
C.
Mario Kart racetrack
A Mario Kart racetrack is a themed, looping course filled with obstacles, shortcuts, and interactive elements where players race go-karts using items to gain advantages or hinder opponents.
-
D.
kart racing game
A kart racing game is a fast-paced, arcade-style driving game where players race small, often customizable go-karts on imaginative tracks while using power-ups and obstacles to outmaneuver opponents.
-
E.
racing video game
A racing video game is an interactive digital game where players control vehicles to compete in speed-based contests on various tracks or environments, often featuring time trials, head-to-head races, and customizable performance or visual options.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626cff80819097b530718a7c98b6 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:39 p.m.