Triple
T20213962
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Malta Ski artificial ski slope |
E493564
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | artificial ski slope |
C35266
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: artificial ski slope Context triple: [Malta Ski artificial ski slope, instanceOf, artificial ski slope]
-
A.
indoor ski slope
chosen
An indoor ski slope is a large, climate-controlled facility that simulates snowy mountain conditions to allow skiing and snowboarding year-round regardless of outdoor weather.
-
B.
artificial hill
An artificial hill is a man-made elevation of land, constructed by humans using soil, rock, or other materials to create a raised landscape feature for practical, aesthetic, or symbolic purposes.
-
C.
surface ski lift
A surface ski lift is a ground-level ski lift system that pulls skiers and snowboarders uphill while they remain standing on the snow, typically using devices like T-bars, platter lifts, or rope tows.
-
D.
ski jumping hill
A ski jumping hill is a specially designed, sloped structure with an inrun, takeoff, and landing area that allows ski jumpers to gain speed and safely perform long-distance jumps.
-
E.
ski area
A ski area is a designated mountain or hillside location equipped with ski lifts, groomed trails, and related facilities where people can ski, snowboard, and engage in other winter sports.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6269614c8190bb40475d9d477358 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:38 p.m.