Triple

T20209226
Position Surface form Disambiguated ID Type / Status
Subject Malpaso Dam E493441 entity
Predicate partOf P40 FINISHED
Object Grijalva River hydroelectric system NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Grijalva River hydroelectric system | Statement: [Malpaso Dam, partOf, Grijalva River hydroelectric system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Grijalva River hydroelectric system
Context triple: [Malpaso Dam, partOf, Grijalva River hydroelectric system]
  • A. Salt River Project
    Salt River Project is a major public utility in Arizona that provides electricity and water to the Phoenix metropolitan area through a combination of power generation, transmission, and irrigation services.
  • B. San Carlos Dam power plant
    San Carlos Dam power plant is a hydroelectric facility that generates electricity using water stored and released from the San Carlos Dam.
  • C. Yaqui Valley irrigation system
    The Yaqui Valley irrigation system is a large-scale agricultural water management network in Sonora, Mexico, that transformed the region into a highly productive center for irrigated farming, especially wheat.
  • D. Copco No. 2 Dam
    Copco No. 2 Dam is a small hydroelectric dam on the Klamath River in northern California that is slated for removal as part of a major river restoration effort.
  • E. Gila River flood control system
    The Gila River flood control system is an integrated network of dams, channels, and related infrastructure designed to manage and mitigate flooding along Arizona’s Gila River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Grijalva River hydroelectric system
Target entity description: The Grijalva River hydroelectric system is a network of major dams and power plants on Mexico’s Grijalva River that generates a significant share of the country’s hydroelectric power.
  • A. Salt River Project
    Salt River Project is a major public utility in Arizona that provides electricity and water to the Phoenix metropolitan area through a combination of power generation, transmission, and irrigation services.
  • B. San Carlos Dam power plant
    San Carlos Dam power plant is a hydroelectric facility that generates electricity using water stored and released from the San Carlos Dam.
  • C. Yaqui Valley irrigation system
    The Yaqui Valley irrigation system is a large-scale agricultural water management network in Sonora, Mexico, that transformed the region into a highly productive center for irrigated farming, especially wheat.
  • D. Copco No. 2 Dam
    Copco No. 2 Dam is a small hydroelectric dam on the Klamath River in northern California that is slated for removal as part of a major river restoration effort.
  • E. Gila River flood control system
    The Gila River flood control system is an integrated network of dams, channels, and related infrastructure designed to manage and mitigate flooding along Arizona’s Gila River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6269614c8190bb40475d9d477358 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e66d94999c8190b67051cb0acea213 completed April 20, 2026, 6:16 p.m.
Created at: April 11, 2026, 11:38 p.m.