Triple
T20207394
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Riga–Jelgava railway |
E493388
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway in Latvia |
C3787
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway in Latvia Context triple: [Riga–Jelgava railway, instanceOf, railway in Latvia]
-
A.
road in Latvia
A road in Latvia is a designated transportation route within the Latvian territory, facilitating vehicular and pedestrian movement between cities, towns, and rural areas according to national infrastructure standards.
-
B.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
C.
railway line
chosen
A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
-
D.
railway network
A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
-
E.
rail
A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6269614c8190bb40475d9d477358 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:38 p.m.