Triple
T20188133
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Steel Dragon 2000 lift system |
E492914
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | chain lift system |
C42898
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: chain lift system Context triple: [Steel Dragon 2000 lift system, instanceOf, chain lift system]
-
A.
aerial lift
An aerial lift is a mechanical device, such as a cable-suspended chair, gondola, or platform, used to transport people or materials above the ground, typically in construction, maintenance, or recreational settings.
-
B.
vertical-lift bridge
A vertical-lift bridge is a movable bridge whose central span rises vertically between two towers to allow river or maritime traffic to pass beneath while maintaining a level roadway.
-
C.
gantry crane
A gantry crane is a type of overhead crane that straddles its workspace on legs or supports, moving along rails or wheels to lift and transport heavy loads.
-
D.
cantilever crane
A cantilever crane is a lifting device with a horizontal beam fixed at one end and projecting outward to support loads without additional vertical support at the free end.
-
E.
lift net
A lift net is a fishing device consisting of a net that is submerged horizontally and then lifted vertically to capture fish or other aquatic organisms.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6268a034819081cbd9ea5a1c9475 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:37 p.m.