Triple
T20188132
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Steel Dragon 2000 lift system |
E492914
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | roller coaster lift system |
C42897
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: roller coaster lift system Context triple: [Steel Dragon 2000 lift system, instanceOf, roller coaster lift system]
-
A.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
B.
roller coaster variant
A roller coaster variant is a specific type or design of roller coaster that differs in track layout, ride mechanics, theming, or rider experience from standard models.
-
C.
cable car system
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
D.
roller coaster concept
A roller coaster concept is a high-level design blueprint that defines the ride’s theme, layout, key elements, and overall experience before detailed engineering and construction begin.
-
E.
steel roller coaster
A steel roller coaster is a high-speed amusement ride featuring smooth, tubular steel tracks that enable complex inversions, steep drops, and precise, controlled maneuvers for riders.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6268a034819081cbd9ea5a1c9475 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:37 p.m.