Triple
T20182103
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oniks cruise missile |
E492754
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | land-attack missile |
C42876
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: land-attack missile Context triple: [Oniks cruise missile, instanceOf, land-attack missile]
-
A.
long-range land-attack missile
A long-range land-attack missile is a guided weapon system designed to strike fixed or relocatable targets deep inland from significant stand-off distances, typically launched from air, sea, or ground platforms.
-
B.
air-to-surface missile
An air-to-surface missile is a guided weapon launched from an aircraft and designed to strike targets on land or at sea with high precision.
-
C.
surface-to-surface missile
A surface-to-surface missile is a guided weapon launched from land or sea platforms designed to strike targets located on the Earth's surface.
-
D.
anti-armor missile
An anti-armor missile is a guided munition designed specifically to detect, track, and destroy armored targets such as tanks and armored vehicles using high-penetration warheads.
-
E.
surface-to-ship missile
A surface-to-ship missile is a guided weapon launched from land, sea, or air platforms specifically designed to detect, track, and destroy naval surface vessels.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6268a034819081cbd9ea5a1c9475 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:36 p.m.