Triple

T2017965
Position Surface form Disambiguated ID Type / Status
Subject Coat of arms of Yemen E44038 entity
Predicate shieldDepicts P10236 FINISHED
Object Marib Dam E224611 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Marib Dam | Statement: [Coat of arms of Yemen, shieldDepicts, Marib Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Marib Dam
Context triple: [Coat of arms of Yemen, shieldDepicts, Marib Dam]
  • A. Marib Dam chosen
    Marib Dam is an ancient and historically significant irrigation dam in Yemen, considered one of the great engineering achievements of the pre-Islamic Arabian world.
  • B. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • C. Betania Dam
    Betania Dam is a major hydroelectric dam and reservoir in Colombia, known for generating power and supporting irrigation and aquaculture in the Huila region.
  • D. Bargi Dam
    Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
  • E. Itá Dam
    Itá Dam is a large hydroelectric power plant and reservoir on the Uruguay River in southern Brazil, known for its significant contribution to regional electricity generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8891201bc8190aca837be6de41579 completed March 4, 2026, 7:33 p.m.
NER Named-entity recognition batch_69abb8ce71788190ac21beff10b08122 completed March 7, 2026, 5:34 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae1fe88e8881909f2e64ebe23b6d1f completed March 9, 2026, 1:18 a.m.
Created at: March 4, 2026, 7:38 p.m.