Triple

T20170917
Position Surface form Disambiguated ID Type / Status
Subject NTPC Limited E491954 entity
Predicate hasSubsidiary P254 FINISHED
Object NTPC Renewable Energy Limited NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NTPC Renewable Energy Limited | Statement: [NTPC Limited, hasSubsidiary, NTPC Renewable Energy Limited]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NTPC Renewable Energy Limited
Context triple: [NTPC Limited, hasSubsidiary, NTPC Renewable Energy Limited]
  • A. NTPC Limited
    NTPC Limited is India’s largest state-owned power generation company, primarily engaged in producing and selling electricity from coal, gas, hydro, and renewable sources across the country.
  • B. NHPC Limited
    NHPC Limited is an Indian government-owned hydropower company that develops, operates, and maintains large hydroelectric projects across the country.
  • C. L&T Power
    L&T Power is a business division of Larsen & Toubro that focuses on providing engineering, procurement, and construction solutions for power generation projects.
  • D. Aditya Birla Renewables
    Aditya Birla Renewables is the renewable energy arm of the Aditya Birla Group, focused on developing and operating clean power projects such as solar and wind energy in India.
  • E. Fortum India Private Limited
    Fortum India Private Limited is the Indian subsidiary of Finnish energy company Fortum, focusing on clean energy solutions and sustainable power generation in India.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: NTPC Renewable Energy Limited
Target entity description: NTPC Renewable Energy Limited is a subsidiary of NTPC Limited focused on developing and operating renewable energy projects such as solar and wind power in India.
  • A. NTPC Limited chosen
    NTPC Limited is India’s largest state-owned power generation company, primarily engaged in producing and selling electricity from coal, gas, hydro, and renewable sources across the country.
  • B. NHPC Limited
    NHPC Limited is an Indian government-owned hydropower company that develops, operates, and maintains large hydroelectric projects across the country.
  • C. L&T Power
    L&T Power is a business division of Larsen & Toubro that focuses on providing engineering, procurement, and construction solutions for power generation projects.
  • D. Aditya Birla Renewables
    Aditya Birla Renewables is the renewable energy arm of the Aditya Birla Group, focused on developing and operating clean power projects such as solar and wind energy in India.
  • E. Fortum India Private Limited
    Fortum India Private Limited is the Indian subsidiary of Finnish energy company Fortum, focusing on clean energy solutions and sustainable power generation in India.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6266c6888190bc1a3ecf24814d34 completed April 11, 2026, 3:01 p.m.
NER Named-entity recognition batch_69e66848ae3c8190aa5fde66da35a89a completed April 20, 2026, 5:54 p.m.
Created at: April 11, 2026, 11:35 p.m.