Triple

T20170916
Position Surface form Disambiguated ID Type / Status
Subject NTPC Limited E491954 entity
Predicate regulator P46 FINISHED
Object Central Electricity Regulatory Commission NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central Electricity Regulatory Commission | Statement: [NTPC Limited, regulator, Central Electricity Regulatory Commission]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Central Electricity Regulatory Commission
Context triple: [NTPC Limited, regulator, Central Electricity Regulatory Commission]
  • A. Central Electricity Regulatory Commission chosen
    The Central Electricity Regulatory Commission is India’s national-level regulatory body responsible for overseeing and regulating the country’s interstate electricity generation, transmission, and trading to ensure fair tariffs and a reliable power sector.
  • B. National Electric Power Regulatory Authority
    The National Electric Power Regulatory Authority (NEPRA) is Pakistan’s federal agency responsible for regulating and overseeing the country’s electric power sector, including licensing, tariffs, and consumer protection.
  • C. Central Electricity Authority
    The Central Electricity Authority is a statutory body under the Government of India responsible for overseeing and advising on the development, planning, and technical coordination of the country’s power sector.
  • D. Central Electricity Board
    The Central Electricity Board was a UK public body responsible for developing and operating the national electricity grid and coordinating power generation before being replaced by later electricity authorities.
  • E. Western Electricity Coordinating Council
    The Western Electricity Coordinating Council is a regional reliability organization that oversees and coordinates the safe, reliable operation of the bulk electric power system across the Western Interconnection in North America.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6266c6888190bc1a3ecf24814d34 completed April 11, 2026, 3:01 p.m.
NER Named-entity recognition batch_69e66848ae3c8190aa5fde66da35a89a completed April 20, 2026, 5:54 p.m.
Created at: April 11, 2026, 11:35 p.m.