Triple
T20170371
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Snow Town (China Snow Town) |
E491942
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | winter resort |
C10808
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: winter resort Context triple: [Snow Town (China Snow Town), instanceOf, winter resort]
-
A.
ski resort town
chosen
A ski resort town is a small community located near mountainous terrain that is primarily oriented around winter sports tourism, offering lodging, dining, and recreational facilities for skiers and snowboarders.
-
B.
winter sport
A winter sport is a recreational or competitive physical activity that is primarily played on snow or ice, often in cold-weather conditions or indoor ice facilities.
-
C.
ski area
A ski area is a designated mountain or hillside location equipped with ski lifts, groomed trails, and related facilities where people can ski, snowboard, and engage in other winter sports.
-
D.
winter residence
A winter residence is a dwelling specifically used or designed for living in during the winter season, often featuring enhanced insulation, heating, and amenities suited to cold weather conditions.
-
E.
resort
A resort is a commercial establishment that provides lodging, dining, recreation, and leisure amenities in a single destination designed for relaxation and vacation experiences.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6266c6888190bc1a3ecf24814d34 |
completed | April 11, 2026, 3:01 p.m. |
Created at: April 11, 2026, 11:35 p.m.