Triple
T20163979
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Funtastic World of Hanna-Barbera |
E491782
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | film-based simulator ride |
C4767
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: film-based simulator ride Context triple: [The Funtastic World of Hanna-Barbera, instanceOf, film-based simulator ride]
-
A.
motion simulator ride
chosen
A motion simulator ride is an amusement attraction that uses synchronized moving platforms, visual displays, and sound effects to create the immersive illusion of traveling through dynamic environments.
-
B.
3D motion-based ride
A 3D motion-based ride is an immersive attraction that synchronizes moving seats or ride vehicles with 3D visual media, sound, and special effects to simulate dynamic, realistic motion experiences.
-
C.
space shot ride
A space shot ride is a vertical amusement park attraction that rapidly launches riders upward along a tower using compressed air or similar propulsion, creating intense acceleration and brief weightlessness.
-
D.
carousel-style ride
A carousel-style ride is an amusement attraction featuring a rotating circular platform with seats, often shaped like animals or vehicles, that move up and down as the ride spins.
-
E.
dark ride
A dark ride is an indoor amusement attraction where passengers travel in guided vehicles through elaborately themed, low-light environments featuring scenes, special effects, and storytelling.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6266c6888190bc1a3ecf24814d34 |
completed | April 11, 2026, 3:01 p.m. |
Created at: April 11, 2026, 11:35 p.m.