Triple
T20163739
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oblivion |
E491777
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | vertical drop roller coaster |
C4764
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: vertical drop roller coaster Context triple: [Oblivion, instanceOf, vertical drop roller coaster]
-
A.
inverted roller coaster
An inverted roller coaster is a type of roller coaster where the train travels beneath the track with riders’ legs dangling freely, creating intense, suspended-feeling maneuvers and inversions.
-
B.
stand-up roller coaster
A stand-up roller coaster is a type of thrill ride where passengers remain standing in specially designed restraints as the train traverses a track with drops, turns, and inversions.
-
C.
roller coaster
chosen
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
D.
launched roller coaster
A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
-
E.
drop tower ride
A drop tower ride is an amusement park attraction where riders are lifted to a great height before being rapidly released to experience a high-speed free fall and sudden deceleration.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6266c6888190bc1a3ecf24814d34 |
completed | April 11, 2026, 3:01 p.m. |
Created at: April 11, 2026, 11:35 p.m.