Triple

T20159470
Position Surface form Disambiguated ID Type / Status
Subject Maribor railway station E491664 entity
Predicate railwayLine P848 FINISHED
Object Pragersko–Šentilj railway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pragersko–Šentilj railway | Statement: [Maribor railway station, railwayLine, Pragersko–Šentilj railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pragersko–Šentilj railway
Context triple: [Maribor railway station, railwayLine, Pragersko–Šentilj railway]
  • A. Jesenice–Nova Gorica railway line
    The Jesenice–Nova Gorica railway line is a rail route in western Slovenia that connects the town of Jesenice with Nova Gorica, running through the scenic Soča Valley and serving as an important regional transport corridor.
  • B. Slovenski Javornik–Rijeka railway
    The Slovenski Javornik–Rijeka railway is a major rail line connecting Slovenia with the Croatian port city of Rijeka, serving as an important route for both passenger and freight transport in the region.
  • C. Ljubljana–Dobova railway line
    The Ljubljana–Dobova railway line is a key rail corridor in Slovenia that connects the capital Ljubljana with the Croatian border near Dobova, forming part of an important international route between Central and Southeastern Europe.
  • D. Villach–Kranj railway
    The Villach–Kranj railway is an international rail line linking southern Austria with northwestern Slovenia, serving as an important cross-border route through the Alps.
  • E. Koper railway line
    The Koper railway line is a key rail route in southwestern Slovenia that connects the port city of Koper on the Adriatic coast with the country’s inland rail network, serving both freight and passenger traffic.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Pragersko–Šentilj railway
Target entity description: The Pragersko–Šentilj railway is a key Slovenian rail line forming part of an important international corridor that connects central Slovenia with Austria via Maribor.
  • A. Jesenice–Nova Gorica railway line
    The Jesenice–Nova Gorica railway line is a rail route in western Slovenia that connects the town of Jesenice with Nova Gorica, running through the scenic Soča Valley and serving as an important regional transport corridor.
  • B. Slovenski Javornik–Rijeka railway
    The Slovenski Javornik–Rijeka railway is a major rail line connecting Slovenia with the Croatian port city of Rijeka, serving as an important route for both passenger and freight transport in the region.
  • C. Ljubljana–Dobova railway line
    The Ljubljana–Dobova railway line is a key rail corridor in Slovenia that connects the capital Ljubljana with the Croatian border near Dobova, forming part of an important international route between Central and Southeastern Europe.
  • D. Villach–Kranj railway
    The Villach–Kranj railway is an international rail line linking southern Austria with northwestern Slovenia, serving as an important cross-border route through the Alps.
  • E. Koper railway line
    The Koper railway line is a key rail route in southwestern Slovenia that connects the port city of Koper on the Adriatic coast with the country’s inland rail network, serving both freight and passenger traffic.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6266c6888190bc1a3ecf24814d34 completed April 11, 2026, 3:01 p.m.
NER Named-entity recognition batch_69e667e37c8c8190827839291027d9e2 completed April 20, 2026, 5:52 p.m.
Created at: April 11, 2026, 11:34 p.m.