Triple

T20153928
Position Surface form Disambiguated ID Type / Status
Subject Infrastructure E491505 entity
Predicate instanceOf P0 FINISHED
Object Economic concept C2555 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Economic concept
Context triple: [Infrastructure, instanceOf, Economic concept]
  • A. economic phenomenon chosen
    An economic phenomenon is any observable event, pattern, or change in the production, distribution, or consumption of goods and services that reflects underlying economic forces and behaviors.
  • B. macroeconomic principle
    A macroeconomic principle is a fundamental concept or rule that explains the behavior and interactions of an economy as a whole, including aggregate output, inflation, unemployment, and growth.
  • C. economic theory
    Economic theory is a conceptual framework that explains how individuals, firms, and governments make decisions about the allocation of scarce resources and how these decisions shape the production, distribution, and consumption of goods and services.
  • D. economic metric
    An economic metric is a quantitative measure used to assess, compare, and track the performance, health, or trends of an economy, market, or financial activity.
  • E. economic policy
    Economic policy is a set of government decisions and actions designed to influence a nation's economic performance, including growth, employment, inflation, and income distribution.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6265f8f0819080b29c752a574088 completed April 11, 2026, 3:01 p.m.
Created at: April 11, 2026, 11:34 p.m.