Triple

T2013971
Position Surface form Disambiguated ID Type / Status
Subject M40 motorway E43750 entity
Predicate completedAsContinuousRoute P34497 FINISHED
Object 1991 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1991 | Statement: [M40 motorway, completedAsContinuousRoute, 1991]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: completedAsContinuousRoute
Context triple: [M40 motorway, completedAsContinuousRoute, 1991]
  • A. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • B. completedBefore
    Indicates that one event or action was fully completed prior to the start or completion of another specified event or action.
  • C. parallelRoute
    Indicates that one route runs alongside and in the same general direction as another route without intersecting it.
  • D. completionRate
    Indicates the proportion of a task, process, or set of items that has been finished relative to its total intended amount.
  • E. continuityFrom
    Indicates that one entity continues, extends, or proceeds directly from another in a seamless or unbroken manner.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88716e9f08190946313fdc949e3cf completed March 4, 2026, 7:25 p.m.
NER Named-entity recognition batch_69abb8b42d508190bf2b63132bb2ad77 completed March 7, 2026, 5:33 a.m.
PD Predicate disambiguation batch_69abb7a03a1c81909ad50d56667db2d5 completed March 7, 2026, 5:29 a.m.
PDg Predicate description generation batch_69abb83e7888819096dc40275c77daff completed March 7, 2026, 5:31 a.m.
Created at: March 4, 2026, 7:37 p.m.