Triple

T20138957
Position Surface form Disambiguated ID Type / Status
Subject Torremolinos E491107 entity
Predicate publicTransport P1288 FINISHED
Object Cercanías Málaga C1 line NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cercanías Málaga C1 line | Statement: [Torremolinos, publicTransport, Cercanías Málaga C1 line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cercanías Málaga C1 line
Context triple: [Torremolinos, publicTransport, Cercanías Málaga C1 line]
  • A. Cercanías Madrid Line C-1
    Cercanías Madrid Line C-1 is a suburban rail line in the Madrid commuter network that connects central Madrid with Adolfo Suárez Madrid–Barajas Airport and other key urban areas.
  • B. Cercanías Madrid Line C-10
    Cercanías Madrid Line C-10 is a commuter rail line in the Madrid metropolitan area that connects key suburban zones with central stations as part of the Cercanías Madrid network.
  • C. Cercanías Madrid Line C-2
    Cercanías Madrid Line C-2 is a commuter rail line in the Madrid metropolitan area that connects central Madrid with its northeastern suburbs as part of the Cercanías Madrid network.
  • D. Cercanías Madrid C3
    Cercanías Madrid C3 is a commuter rail line in the Madrid metropolitan area that connects central Madrid with various suburban and outlying towns.
  • E. Cercanías Madrid Line C-3
    Cercanías Madrid Line C-3 is a commuter rail line in the Madrid metropolitan area that connects central Madrid with its southern suburbs and surrounding towns as part of the Cercanías Madrid network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Cercanías Málaga C1 line
Target entity description: The Cercanías Málaga C1 line is a suburban rail service in Spain’s Costa del Sol that connects Málaga with coastal towns including Torremolinos and Fuengirola.
  • A. Cercanías Madrid Line C-1
    Cercanías Madrid Line C-1 is a suburban rail line in the Madrid commuter network that connects central Madrid with Adolfo Suárez Madrid–Barajas Airport and other key urban areas.
  • B. Cercanías Madrid Line C-10
    Cercanías Madrid Line C-10 is a commuter rail line in the Madrid metropolitan area that connects key suburban zones with central stations as part of the Cercanías Madrid network.
  • C. Cercanías Madrid Line C-2
    Cercanías Madrid Line C-2 is a commuter rail line in the Madrid metropolitan area that connects central Madrid with its northeastern suburbs as part of the Cercanías Madrid network.
  • D. Cercanías Madrid C3
    Cercanías Madrid C3 is a commuter rail line in the Madrid metropolitan area that connects central Madrid with various suburban and outlying towns.
  • E. Cercanías Madrid Line C-3
    Cercanías Madrid Line C-3 is a commuter rail line in the Madrid metropolitan area that connects central Madrid with its southern suburbs and surrounding towns as part of the Cercanías Madrid network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da62651a0c8190a3e05e95e056a66b completed April 11, 2026, 3:01 p.m.
NER Named-entity recognition batch_69e667698a188190869c18b925dba2ed completed April 20, 2026, 5:50 p.m.
Created at: April 11, 2026, 11:32 p.m.