Triple

T201366
Position Surface form Disambiguated ID Type / Status
Subject NASA Astrobiology Institute E4511 entity
Predicate instanceOf P0 FINISHED
Object NASA program C420 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: NASA program
Context triple: [NASA Astrobiology Institute, instanceOf, NASA program]
  • A. NASA mission component
    A NASA mission component is a distinct hardware, software, or operational element designed to perform a specific function that contributes to the overall objectives and success of a NASA space mission.
  • B. space communication project
    A space communication project is an organized effort to design, develop, and operate systems that enable reliable data and signal exchange between spacecraft, satellites, and ground stations.
  • C. United States government program
    A United States government program is an organized set of activities, services, or regulations funded and administered by federal agencies to achieve specific public policy goals or address national needs.
  • D. federal government program
    A federal government program is an organized set of activities, services, or regulations funded and administered by the national government to achieve specific public policy goals.
  • E. United States federal government program chosen
    A United States federal government program is an organized set of activities, services, or regulations funded and administered by federal agencies to implement national policies and address public needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a25737567c81908f9c505300239181 completed Feb. 28, 2026, 2:47 a.m.
Created at: Feb. 28, 2026, 2:51 a.m.