Triple
T20136283
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Anthony Murphy |
E491033
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Confederate railroad engineer |
C18526
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Confederate railroad engineer Context triple: [Anthony Murphy, instanceOf, Confederate railroad engineer]
-
A.
Panama Canal engineer
A Panama Canal engineer is a professional responsible for designing, maintaining, and optimizing the canal’s complex system of locks, channels, and supporting infrastructure to ensure safe and efficient maritime transit between the Atlantic and Pacific Oceans.
-
B.
Confederate Army general
A Confederate Army general was a high-ranking military officer who commanded Confederate forces during the American Civil War, overseeing strategy, operations, and troops in support of the secessionist Southern states.
-
C.
Confederate agent
chosen
A Confederate agent is an individual who covertly gathered intelligence, conducted sabotage, or engaged in clandestine operations in support of the Confederate States during the American Civil War.
-
D.
locomotive designer
A locomotive designer is a specialist who conceptualizes, engineers, and refines the structure, mechanics, and aesthetics of locomotives to meet performance, safety, and operational requirements.
-
E.
locomotive designer
A locomotive designer is a professional who conceptualizes, engineers, and refines the structure, systems, and aesthetics of locomotives to meet performance, safety, and regulatory requirements.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da62651a0c8190a3e05e95e056a66b |
completed | April 11, 2026, 3:01 p.m. |
Created at: April 11, 2026, 11:32 p.m.