Triple

T2012982
Position Surface form Disambiguated ID Type / Status
Subject Gwynt y Môr Wind Farm E43730 entity
Predicate developer P73 FINISHED
Object RWE Innogy E226682 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RWE Innogy | Statement: [Gwynt y Môr Wind Farm, developer, RWE Innogy]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: RWE Innogy
Context triple: [Gwynt y Môr Wind Farm, developer, RWE Innogy]
  • A. RWE chosen
    RWE is a major German energy company that operates internationally, with significant investments in renewable power generation such as large offshore wind farms.
  • B. EDF Renewables
    EDF Renewables is a global renewable energy company specializing in the development, construction, and operation of wind, solar, and energy storage projects.
  • C. Ørsted
    Ørsted is a Danish renewable energy company and one of the world’s leading developers and operators of offshore wind farms.
  • D. Engie
    Engie is a major French multinational utility company specializing in electricity, natural gas, and energy services, with a strong focus on renewable and low-carbon energy solutions.
  • E. Exelon
    Exelon is a major American energy company and utility services holding corporation, known for operating one of the largest fleets of nuclear power plants in the United States.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88716e9f08190946313fdc949e3cf completed March 4, 2026, 7:25 p.m.
NER Named-entity recognition batch_69abb8b2ed6c8190ad51f0af90db2a02 completed March 7, 2026, 5:33 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae1fe5ad548190b4a64c5320b99c6d completed March 9, 2026, 1:18 a.m.
Created at: March 4, 2026, 7:37 p.m.