Triple

T20101034
Position Surface form Disambiguated ID Type / Status
Subject Line 2 (Lille Metro) E496538 entity
Predicate instanceOf P0 FINISHED
Object automated light metro line C31335 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: automated light metro line
Context triple: [Line 2 (Lille Metro), instanceOf, automated light metro line]
  • A. light metro chosen
    A light metro is a grade-separated, medium-capacity urban rail transit system that uses smaller trains and shorter headways than full-scale metros to efficiently serve moderate-demand corridors.
  • B. light rail transit line
    A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
  • C. monorail transit line
    A monorail transit line is an elevated or ground-level guided transportation system in which trains run on a single rail, typically used for urban or campus passenger service.
  • D. automated guideway transit line
    An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
  • E. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626eee3881909f3454986d4a6511 completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 11:26 p.m.