Triple
T20097779
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Glass Bridge |
E496449
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pedestrian bridge type |
C3860
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pedestrian bridge type Context triple: [Glass Bridge, instanceOf, pedestrian bridge type]
-
A.
pedestrian bridge
chosen
A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
-
B.
pedestrian skybridge
A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
-
C.
ornamental bridge
An ornamental bridge is a decorative structure, often smaller in scale than functional bridges, designed primarily to enhance the aesthetic appeal of a landscape or garden while sometimes providing light pedestrian passage.
-
D.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
E.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626eee3881909f3454986d4a6511 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:25 p.m.