Triple

T20088587
Position Surface form Disambiguated ID Type / Status
Subject Shay locomotive E496204 entity
Predicate instanceOf P0 FINISHED
Object geared steam locomotive C3459 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: geared steam locomotive
Context triple: [Shay locomotive, instanceOf, geared steam locomotive]
  • A. steam-powered railway
    A steam-powered railway is a transportation system in which trains are propelled along tracks by locomotives that generate mechanical power from steam produced by boiling water, typically using coal or other fuels.
  • B. streamlined locomotive
    A streamlined locomotive is a high-speed railway engine designed with smooth, aerodynamic contours to reduce air resistance and improve efficiency and performance.
  • C. railway locomotive chosen
    A railway locomotive is a powered rail vehicle that provides the motive force to pull or push trains along railway tracks.
  • D. stationary steam engine
    A stationary steam engine is a fixed, non-mobile engine that converts the thermal energy of steam into mechanical work to drive machinery or generate power in a single location.
  • E. standardized steam locomotive design program
    A standardized steam locomotive design program is an organized initiative to develop, adopt, and manage a uniform set of locomotive designs to simplify production, maintenance, and operation across a railway system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626eee3881909f3454986d4a6511 completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 11:17 p.m.