Triple

T20085059
Position Surface form Disambiguated ID Type / Status
Subject Anderson, South Carolina E500103 entity
Predicate nickname P55 FINISHED
Object Electric City NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Electric City | Statement: [Anderson, South Carolina, nickname, Electric City]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Electric City
Context triple: [Anderson, South Carolina, nickname, Electric City]
  • A. Electric City
    Electric City is a nickname for Peterborough, Ontario, reflecting its early and prominent use of hydroelectric power and electric streetlights.
  • B. Electric City
    Electric City is a nickname for Scranton, Pennsylvania, reflecting its early adoption of electric streetcars and status as a pioneering electrified city in the United States.
  • C. Electric City chosen
    Electric City is the nickname of Anderson, South Carolina, reflecting its early adoption of electricity and historic role in hydroelectric power development.
  • D. The Electric City
    The Electric City is the nickname of Kaukauna, Wisconsin, reflecting its early and extensive use of hydroelectric power from the Fox River.
  • E. The Electric City
    The Electric City is the nickname of Schenectady, New York, reflecting its historic role as a major center for the electrical industry and home to General Electric.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da627770948190997f486f9a2e370f completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6655ae9ec8190bde2f17452639de8 completed April 20, 2026, 5:41 p.m.
Created at: April 11, 2026, 3:41 p.m.