Triple

T20047096
Position Surface form Disambiguated ID Type / Status
Subject Mactan wharves E497588 entity
Predicate instanceOf P0 FINISHED
Object wharves C42790 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: wharves
Context triple: [Mactan wharves, instanceOf, wharves]
  • A. boatyard
    A boatyard is a waterside facility where boats and ships are built, repaired, maintained, and often stored on land.
  • B. wet dock
    A wet dock is an enclosed, water-filled harbor basin where ships can be moored, loaded, and unloaded while maintaining a constant water level independent of tides.
  • C. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • D. river pier
    A river pier is a fixed or floating structure extending from the riverbank into the water, used for mooring boats, loading and unloading goods or passengers, and providing access to the river.
  • E. canal wharf
    A canal wharf is a designated waterside area along a canal where boats can moor to load and unload cargo or passengers.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da627278c88190babe4297a9df1236 completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 3:37 p.m.