Triple
T20029700
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Grand Bassin of Castelnaudary |
E495087
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Canal du Midi infrastructure |
C22224
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Canal du Midi infrastructure Context triple: [Grand Bassin of Castelnaudary, instanceOf, Canal du Midi infrastructure]
-
A.
Renaissance aqueduct
A Renaissance aqueduct is a monumental water-conveyance structure that revives and refines classical Roman engineering principles to transport water over long distances using arches, channels, and gravity-driven flow.
-
B.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
C.
canal basin
chosen
A canal basin is a widened, often enclosed section of a canal used for mooring, turning, loading, unloading, and managing waterborne traffic.
-
D.
stone aqueduct
A stone aqueduct is a large, elevated structure built from masonry that transports water across distances using gravity-fed channels supported by arches or pillars.
-
E.
Vauban fortification
A Vauban fortification is a star-shaped, bastioned defensive work characterized by angular walls, layered outworks, and geometric design optimized to resist and control artillery fire.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626bfd288190aa5d65098b6433ae |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 3:36 p.m.