Triple
T20019037
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Storheia wind farm |
E494798
|
entity |
| Predicate | relatedTo |
P37
|
FINISHED |
| Object | Fosen wind power development |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fosen wind power development | Statement: [Storheia wind farm, relatedTo, Fosen wind power development]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Fosen wind power development Context triple: [Storheia wind farm, relatedTo, Fosen wind power development]
-
A.
Horns Rev offshore wind projects
The Horns Rev offshore wind projects are a series of large-scale wind farms in the North Sea off the coast of Denmark, recognized as pioneering installations in the development of modern offshore wind energy.
-
B.
North Sea offshore wind farms
North Sea offshore wind farms are large-scale renewable energy installations located in the North Sea that generate electricity from wind power using arrays of offshore wind turbines.
-
C.
Storheia wind farm
Storheia wind farm is a large onshore wind power facility in the Fosen region of Norway, known as one of the country’s biggest wind farms and a focal point in debates over renewable energy and Indigenous Sámi reindeer herding rights.
-
D.
Kvenndalsfjellet wind farm
Kvenndalsfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
-
E.
Harbaksfjellet wind farm
Harbaksfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Fosen wind power development Target entity description: Fosen wind power development is a large onshore wind power project in Trøndelag, Norway, comprising several wind farms and known for both its significant renewable energy production and its controversy over impacts on Sámi reindeer herding.
-
A.
Horns Rev offshore wind projects
The Horns Rev offshore wind projects are a series of large-scale wind farms in the North Sea off the coast of Denmark, recognized as pioneering installations in the development of modern offshore wind energy.
-
B.
North Sea offshore wind farms
North Sea offshore wind farms are large-scale renewable energy installations located in the North Sea that generate electricity from wind power using arrays of offshore wind turbines.
-
C.
Storheia wind farm
chosen
Storheia wind farm is a large onshore wind power facility in the Fosen region of Norway, known as one of the country’s biggest wind farms and a focal point in debates over renewable energy and Indigenous Sámi reindeer herding rights.
-
D.
Kvenndalsfjellet wind farm
Kvenndalsfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
-
E.
Harbaksfjellet wind farm
Harbaksfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626bfd288190aa5d65098b6433ae |
completed | April 11, 2026, 3:02 p.m. |
| NER | Named-entity recognition | batch_69e6623e40748190b1abb0ead9acab4e |
completed | April 20, 2026, 5:28 p.m. |
Created at: April 11, 2026, 3:34 p.m.