Triple

T20019002
Position Surface form Disambiguated ID Type / Status
Subject Storheia wind farm E494798 entity
Predicate partOf P40 FINISHED
Object Fosen Vind project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fosen Vind project | Statement: [Storheia wind farm, partOf, Fosen Vind project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fosen Vind project
Context triple: [Storheia wind farm, partOf, Fosen Vind project]
  • A. Horns Rev offshore wind projects
    The Horns Rev offshore wind projects are a series of large-scale wind farms in the North Sea off the coast of Denmark, recognized as pioneering installations in the development of modern offshore wind energy.
  • B. Storheia wind farm
    Storheia wind farm is a large onshore wind power facility in the Fosen region of Norway, known as one of the country’s biggest wind farms and a focal point in debates over renewable energy and Indigenous Sámi reindeer herding rights.
  • C. Kvenndalsfjellet wind farm
    Kvenndalsfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
  • D. MHI Vestas Offshore Wind
    MHI Vestas Offshore Wind is a Denmark-based company specializing in the development, manufacture, and installation of large-scale offshore wind turbines and related solutions.
  • E. Harbaksfjellet wind farm
    Harbaksfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Fosen Vind project
Target entity description: The Fosen Vind project is a large onshore wind power development in Norway, comprising multiple wind farms and representing one of Europe’s biggest land-based renewable energy initiatives.
  • A. Horns Rev offshore wind projects
    The Horns Rev offshore wind projects are a series of large-scale wind farms in the North Sea off the coast of Denmark, recognized as pioneering installations in the development of modern offshore wind energy.
  • B. Storheia wind farm
    Storheia wind farm is a large onshore wind power facility in the Fosen region of Norway, known as one of the country’s biggest wind farms and a focal point in debates over renewable energy and Indigenous Sámi reindeer herding rights.
  • C. Kvenndalsfjellet wind farm
    Kvenndalsfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
  • D. MHI Vestas Offshore Wind
    MHI Vestas Offshore Wind is a Denmark-based company specializing in the development, manufacture, and installation of large-scale offshore wind turbines and related solutions.
  • E. Harbaksfjellet wind farm
    Harbaksfjellet wind farm is a Norwegian onshore wind power facility located in the Fosen region, contributing renewable electricity to the national grid.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626bfd288190aa5d65098b6433ae completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6623e40748190b1abb0ead9acab4e completed April 20, 2026, 5:28 p.m.
Created at: April 11, 2026, 3:34 p.m.