Triple

T20018483
Position Surface form Disambiguated ID Type / Status
Subject Ulstein E494783 entity
Predicate hasTransportInfrastructure P2560 FINISHED
Object Eiksund Tunnel NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eiksund Tunnel | Statement: [Ulstein, hasTransportInfrastructure, Eiksund Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eiksund Tunnel
Context triple: [Ulstein, hasTransportInfrastructure, Eiksund Tunnel]
  • A. Eiksund Tunnel chosen
    The Eiksund Tunnel is a deep undersea road tunnel in western Norway that links islands in Møre og Romsdal county to the mainland as part of the regional highway network.
  • B. Vallavik Tunnel
    Vallavik Tunnel is a road tunnel in western Norway that forms part of the regional highway network connecting to the Hardanger Bridge.
  • C. Gudvanga Tunnel
    Gudvanga Tunnel is a major road tunnel in western Norway, known as one of the country's longest tunnels and a key part of the E16 route through the fjord region.
  • D. Drogden Tunnel
    The Drogden Tunnel is an underwater road and rail tunnel beneath the Øresund Strait that forms the submerged section of the fixed link between Denmark and Sweden.
  • E. Tromsøysund Tunnel
    Tromsøysund Tunnel is an undersea road tunnel in northern Norway that connects the island city of Tromsø to the mainland.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626bfd288190aa5d65098b6433ae completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6623e40748190b1abb0ead9acab4e completed April 20, 2026, 5:28 p.m.
Created at: April 11, 2026, 3:34 p.m.