Triple

T20016120
Position Surface form Disambiguated ID Type / Status
Subject Belo Monte Dam E494721 entity
Predicate formerName P65 FINISHED
Object Kararaô Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kararaô Dam | Statement: [Belo Monte Dam, formerName, Kararaô Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kararaô Dam
Context triple: [Belo Monte Dam, formerName, Kararaô Dam]
  • A. Jirau Dam
    Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
  • B. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • C. Tilaiya Dam
    Tilaiya Dam is a multipurpose masonry dam in Jharkhand, India, built as part of the Damodar Valley Corporation project to provide hydroelectric power, irrigation, and flood control.
  • D. Mutirikwi Dam
    Mutirikwi Dam is a major concrete arch dam in southeastern Zimbabwe that creates Lake Mutirikwi and serves as an important source of irrigation water and hydroelectric power.
  • E. Lodoyo Dam
    Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kararaô Dam
Target entity description: Kararaô Dam is the former name of Brazil’s massive Belo Monte Dam, a controversial hydroelectric project on the Xingu River in the Amazon.
  • A. Jirau Dam
    Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
  • B. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • C. Tilaiya Dam
    Tilaiya Dam is a multipurpose masonry dam in Jharkhand, India, built as part of the Damodar Valley Corporation project to provide hydroelectric power, irrigation, and flood control.
  • D. Mutirikwi Dam
    Mutirikwi Dam is a major concrete arch dam in southeastern Zimbabwe that creates Lake Mutirikwi and serves as an important source of irrigation water and hydroelectric power.
  • E. Lodoyo Dam
    Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626bfd288190aa5d65098b6433ae completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6623cb8188190b95913ffed895930 completed April 20, 2026, 5:28 p.m.
Created at: April 11, 2026, 3:34 p.m.