Triple

T20016092
Position Surface form Disambiguated ID Type / Status
Subject Belo Monte Dam E494721 entity
Predicate countryPlanningAgency P138385 FINISHED
Object Eletrobras NE NERFINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eletrobras | Statement: [Belo Monte Dam, countryPlanningAgency, Eletrobras]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eletrobras
Context triple: [Belo Monte Dam, countryPlanningAgency, Eletrobras]
  • A. Eletrosul
    Eletrosul is a Brazilian state-owned electric power company focused on generation and transmission in the southern region of Brazil.
  • B. CPFL Energia
    CPFL Energia is a major Brazilian electric utility company engaged in the generation, distribution, and commercialization of electricity across multiple regions of Brazil.
  • C. Santo Antônio Energia
    Santo Antônio Energia is a Brazilian energy company responsible for operating and managing the Santo Antônio hydroelectric power plant on the Madeira River.
  • D. Furnas Centrais Elétricas
    Furnas Centrais Elétricas is a major Brazilian state-controlled electric utility company focused on the generation and transmission of hydroelectric power.
  • E. Norte Energia S.A.
    Norte Energia S.A. is a Brazilian energy company formed by a consortium of public and private entities to build and operate the massive Belo Monte hydroelectric complex in the Amazon.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Eletrobras
Target entity description: Eletrobras is Brazil’s largest electric utility company, primarily state-controlled and a major player in power generation and transmission across the country.
  • A. Eletrosul
    Eletrosul is a Brazilian state-owned electric power company focused on generation and transmission in the southern region of Brazil.
  • B. CPFL Energia
    CPFL Energia is a major Brazilian electric utility company engaged in the generation, distribution, and commercialization of electricity across multiple regions of Brazil.
  • C. Santo Antônio Energia
    Santo Antônio Energia is a Brazilian energy company responsible for operating and managing the Santo Antônio hydroelectric power plant on the Madeira River.
  • D. Furnas Centrais Elétricas
    Furnas Centrais Elétricas is a major Brazilian state-controlled electric utility company focused on the generation and transmission of hydroelectric power.
  • E. Norte Energia S.A.
    Norte Energia S.A. is a Brazilian energy company formed by a consortium of public and private entities to build and operate the massive Belo Monte hydroelectric complex in the Amazon.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: countryPlanningAgency
Context triple: [Belo Monte Dam, countryPlanningAgency, Eletrobras]
  • A. planningNation
    Indicates that a nation is responsible for planning, organizing, or coordinating the referenced activity, event, or operation.
  • B. urbanPlanningBody
    Indicates that an entity serves as an official organization responsible for planning, regulating, or managing urban development and land use.
  • C. cityOfPlanning
    Indicates the city where the planning or design activities for something (e.g., a project, event, or development) are carried out.
  • D. urbanPlanningFunction
    Indicates a functional role or purpose that something serves within the planning, organization, or management of urban spaces and infrastructure.
  • E. regionalPlanningInstrument
    Indicates that an entity is a formal tool, policy, or framework used to guide and regulate planning and development within a specific geographic region.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626bfd288190aa5d65098b6433ae completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6623cb8188190b95913ffed895930 completed April 20, 2026, 5:28 p.m.
PD Predicate disambiguation batch_69e54cdddbd48190becc8b2aa5ab4ef9 completed April 19, 2026, 9:45 p.m.
PDg Predicate description generation batch_69e54fc20888819083c9118a09d0d2dc completed April 19, 2026, 9:57 p.m.
Created at: April 11, 2026, 3:34 p.m.