Triple

T20008844
Position Surface form Disambiguated ID Type / Status
Subject Narbonne Cathedral E494532 entity
Predicate constructionEndStatus P98744 FINISHED
Object unfinished LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: unfinished | Statement: [Narbonne Cathedral, constructionEndStatus, unfinished]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionEndStatus
Context triple: [Narbonne Cathedral, constructionEndStatus, unfinished]
  • A. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • B. constructionCompletedUnder
    Indicates that the completion of a construction project occurred under the responsibility, authority, or supervision of a specified agent, organization, or governing body.
  • C. typicalConstructionEnd
    Indicates the usual or expected point in time or stage at which a construction process or building project is completed.
  • D. buildingEnd chosen
    Indicates the point or time at which the construction or existence of a building comes to a conclusion.
  • E. developmentEnded
    Indicates that the process of creating, improving, or expanding something has been completed and no further development is taking place.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626b2d748190886981ea90c8b2ea completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e661a7500481908b69f74e479f88c8 completed April 20, 2026, 5:25 p.m.
PD Predicate disambiguation batch_69e54cdddbd48190becc8b2aa5ab4ef9 completed April 19, 2026, 9:45 p.m.
Created at: April 11, 2026, 3:33 p.m.