Triple

T20000863
Position Surface form Disambiguated ID Type / Status
Subject Buckshaw Village E494321 entity
Predicate developedOnSiteOf P33964 FINISHED
Object Royal Ordnance Factory Chorley NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Royal Ordnance Factory Chorley | Statement: [Buckshaw Village, developedOnSiteOf, Royal Ordnance Factory Chorley]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Royal Ordnance Factory Chorley
Context triple: [Buckshaw Village, developedOnSiteOf, Royal Ordnance Factory Chorley]
  • A. Royal Ordnance Factory Dalmuir
    Royal Ordnance Factory Dalmuir was a major British munitions and armaments manufacturing plant located in Clydebank, Scotland, that played a significant role in both World Wars.
  • B. Royal Small Arms Factory Enfield
    Royal Small Arms Factory Enfield was a major British government-owned arms manufacturer best known for producing iconic military firearms such as the Lee–Enfield rifle and later the SA80 family of weapons.
  • C. Horwich Works
    Horwich Works was a major railway locomotive construction and maintenance facility in Horwich, England, historically associated with the Lancashire and Yorkshire Railway.
  • D. Darlington Works
    Darlington Works was a major railway engineering and locomotive-building facility in Darlington, England, historically significant for constructing and maintaining steam locomotives and rolling stock.
  • E. Lithgow Small Arms Factory
    Lithgow Small Arms Factory is an Australian government-owned arms manufacturer best known for producing military rifles and other small arms for the Australian armed forces throughout the 20th century.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Royal Ordnance Factory Chorley
Target entity description: Royal Ordnance Factory Chorley was a major British munitions manufacturing plant in Lancashire that played a significant role in armaments production during the 20th century, particularly in World War II.
  • A. Royal Ordnance Factory Dalmuir
    Royal Ordnance Factory Dalmuir was a major British munitions and armaments manufacturing plant located in Clydebank, Scotland, that played a significant role in both World Wars.
  • B. Royal Small Arms Factory Enfield
    Royal Small Arms Factory Enfield was a major British government-owned arms manufacturer best known for producing iconic military firearms such as the Lee–Enfield rifle and later the SA80 family of weapons.
  • C. Horwich Works
    Horwich Works was a major railway locomotive construction and maintenance facility in Horwich, England, historically associated with the Lancashire and Yorkshire Railway.
  • D. Darlington Works
    Darlington Works was a major railway engineering and locomotive-building facility in Darlington, England, historically significant for constructing and maintaining steam locomotives and rolling stock.
  • E. Lithgow Small Arms Factory
    Lithgow Small Arms Factory is an Australian government-owned arms manufacturer best known for producing military rifles and other small arms for the Australian armed forces throughout the 20th century.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626b2d748190886981ea90c8b2ea completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e661a15f308190a99ac3205f948acb completed April 20, 2026, 5:25 p.m.
Created at: April 11, 2026, 3:32 p.m.