Triple

T19992420
Position Surface form Disambiguated ID Type / Status
Subject Marktbreit E494094 entity
Predicate connectedBy P37 FINISHED
Object Main–Würzburg railway line NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Main–Würzburg railway line | Statement: [Marktbreit, connectedBy, Main–Würzburg railway line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Main–Würzburg railway line
Context triple: [Marktbreit, connectedBy, Main–Würzburg railway line]
  • A. Würzburg–Bamberg railway
    The Würzburg–Bamberg railway is a major German main line in northern Bavaria that connects the cities of Würzburg and Bamberg and forms part of important long-distance and regional rail routes.
  • B. Würzburg–Aschaffenburg railway
    The Würzburg–Aschaffenburg railway is a key mainline rail route in northern Bavaria, Germany, connecting the city of Würzburg with Aschaffenburg and forming part of an important east–west transport corridor.
  • C. Würzburg–Stuttgart railway
    The Würzburg–Stuttgart railway is a major German rail route connecting the Franconian city of Würzburg with the Baden-Württemberg capital Stuttgart, serving both regional and long-distance passenger and freight traffic.
  • D. Würzburg–Treuchtlingen railway
    The Würzburg–Treuchtlingen railway is a major German main line in northern Bavaria that connects Würzburg with Treuchtlingen and forms an important north–south rail corridor.
  • E. Nuremberg–Würzburg railway
    The Nuremberg–Würzburg railway is a major German main line in Bavaria that connects the cities of Nuremberg and Würzburg and forms part of an important north–south and east–west rail corridor.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Main–Würzburg railway line
Target entity description: The Main–Würzburg railway line is a German rail route in northern Bavaria that links towns along the River Main with the regional hub of Würzburg.
  • A. Würzburg–Bamberg railway
    The Würzburg–Bamberg railway is a major German main line in northern Bavaria that connects the cities of Würzburg and Bamberg and forms part of important long-distance and regional rail routes.
  • B. Würzburg–Aschaffenburg railway
    The Würzburg–Aschaffenburg railway is a key mainline rail route in northern Bavaria, Germany, connecting the city of Würzburg with Aschaffenburg and forming part of an important east–west transport corridor.
  • C. Würzburg–Stuttgart railway
    The Würzburg–Stuttgart railway is a major German rail route connecting the Franconian city of Würzburg with the Baden-Württemberg capital Stuttgart, serving both regional and long-distance passenger and freight traffic.
  • D. Würzburg–Treuchtlingen railway
    The Würzburg–Treuchtlingen railway is a major German main line in northern Bavaria that connects Würzburg with Treuchtlingen and forms an important north–south rail corridor.
  • E. Nuremberg–Würzburg railway
    The Nuremberg–Würzburg railway is a major German main line in Bavaria that connects the cities of Nuremberg and Würzburg and forms part of an important north–south and east–west rail corridor.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626a67648190af9653832a3aeced completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e65fe10ffc81908c94168b0a8ea9c9 completed April 20, 2026, 5:18 p.m.
Created at: April 11, 2026, 3:31 p.m.