Triple

T1999168
Position Surface form Disambiguated ID Type / Status
Subject Polish Glacier Route E43424 entity
Predicate instanceOf P0 FINISHED
Object climbing route C6569 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: climbing route
Context triple: [Polish Glacier Route, instanceOf, climbing route]
  • A. rock climbing route
    A rock climbing route is a predefined path on a rock face or climbing wall, marked or understood by specific holds and movements, that climbers follow from start to finish at a given difficulty.
  • B. ice climbing route chosen
    An ice climbing route is a designated path up a frozen surface, such as an icefall or glacier, characterized by its difficulty, length, and required protection and techniques.
  • C. traditional climbing route
    A traditional climbing route is a rock climb where climbers place and remove their own protective gear in natural features of the rock as they ascend, rather than relying on pre-fixed bolts.
  • D. multi-pitch climbing route
    A multi-pitch climbing route is a long rock climb divided into several sequential rope-length sections (pitches), each ending at a belay station where climbers regroup before continuing upward.
  • E. big wall rock climbing route
    A big wall rock climbing route is a long, multi-pitch climb on a large cliff or rock face that typically requires advanced skills, significant time (often more than a day), and specialized gear for ascending, hauling, and sometimes overnight bivouacs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88715dbbc8190b2299e29e955d997 completed March 4, 2026, 7:25 p.m.
Created at: March 4, 2026, 7:37 p.m.