Triple
T19986649
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Reliance Power |
E493948
|
entity |
| Predicate | notableProject |
P4
|
FINISHED |
| Object | Tilaiya Ultra Mega Power Project (planned) |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tilaiya Ultra Mega Power Project (planned) | Statement: [Reliance Power, notableProject, Tilaiya Ultra Mega Power Project (planned)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Tilaiya Ultra Mega Power Project (planned) Context triple: [Reliance Power, notableProject, Tilaiya Ultra Mega Power Project (planned)]
-
A.
Talwandi Sabo Power Project
Talwandi Sabo Power Project is a major coal-based thermal power plant located in Punjab, India, that significantly contributes to the region’s electricity supply.
-
B.
Ujjani Hydroelectric Project
Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
-
C.
Ramu 1 Hydropower Project
Ramu 1 Hydropower Project is a planned hydroelectric power station on Papua New Guinea’s Ramu River intended to generate electricity for regional development and the national grid.
-
D.
Rampur Hydroelectric Project
Rampur Hydroelectric Project is a run-of-the-river hydroelectric power station in Himachal Pradesh, India, that harnesses the Sutlej River to generate electricity.
-
E.
Indravati Hydroelectric Project
Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Tilaiya Ultra Mega Power Project (planned) Target entity description: Tilaiya Ultra Mega Power Project (planned) is a proposed large-scale coal-based power generation project in Jharkhand, India, intended to significantly augment the country's electricity capacity.
-
A.
Talwandi Sabo Power Project
Talwandi Sabo Power Project is a major coal-based thermal power plant located in Punjab, India, that significantly contributes to the region’s electricity supply.
-
B.
Ujjani Hydroelectric Project
Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
-
C.
Ramu 1 Hydropower Project
Ramu 1 Hydropower Project is a planned hydroelectric power station on Papua New Guinea’s Ramu River intended to generate electricity for regional development and the national grid.
-
D.
Rampur Hydroelectric Project
Rampur Hydroelectric Project is a run-of-the-river hydroelectric power station in Himachal Pradesh, India, that harnesses the Sutlej River to generate electricity.
-
E.
Indravati Hydroelectric Project
Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626a67648190af9653832a3aeced |
completed | April 11, 2026, 3:02 p.m. |
| NER | Named-entity recognition | batch_69e65d16f60c81909ba02c0a3429ecae |
completed | April 20, 2026, 5:06 p.m. |
Created at: April 11, 2026, 3:29 p.m.