Triple

T19986648
Position Surface form Disambiguated ID Type / Status
Subject Reliance Power E493948 entity
Predicate notableProject P4 FINISHED
Object Samalkot Power Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Samalkot Power Project | Statement: [Reliance Power, notableProject, Samalkot Power Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Samalkot Power Project
Context triple: [Reliance Power, notableProject, Samalkot Power Project]
  • A. Talwandi Sabo Power Project
    Talwandi Sabo Power Project is a major coal-based thermal power plant located in Punjab, India, that significantly contributes to the region’s electricity supply.
  • B. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • C. Rampur Hydroelectric Project
    Rampur Hydroelectric Project is a run-of-the-river hydroelectric power station in Himachal Pradesh, India, that harnesses the Sutlej River to generate electricity.
  • D. Bhadra Hydel Project
    Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
  • E. Rana Pratap Sagar Power Station
    Rana Pratap Sagar Power Station is a hydroelectric power facility in Rajasthan, India, that generates electricity using water from the Rana Pratap Sagar Dam on the Chambal River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Samalkot Power Project
Target entity description: The Samalkot Power Project is a large natural gas-based power generation facility in Andhra Pradesh, India, developed by Reliance Power as part of its expansion in the country’s energy sector.
  • A. Talwandi Sabo Power Project
    Talwandi Sabo Power Project is a major coal-based thermal power plant located in Punjab, India, that significantly contributes to the region’s electricity supply.
  • B. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • C. Rampur Hydroelectric Project
    Rampur Hydroelectric Project is a run-of-the-river hydroelectric power station in Himachal Pradesh, India, that harnesses the Sutlej River to generate electricity.
  • D. Bhadra Hydel Project
    Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
  • E. Rana Pratap Sagar Power Station
    Rana Pratap Sagar Power Station is a hydroelectric power facility in Rajasthan, India, that generates electricity using water from the Rana Pratap Sagar Dam on the Chambal River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626a67648190af9653832a3aeced completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e65d16f60c81909ba02c0a3429ecae completed April 20, 2026, 5:06 p.m.
Created at: April 11, 2026, 3:29 p.m.