Triple

T19986645
Position Surface form Disambiguated ID Type / Status
Subject Reliance Power E493948 entity
Predicate notableProject P4 FINISHED
Object Sasan Ultra Mega Power Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sasan Ultra Mega Power Project | Statement: [Reliance Power, notableProject, Sasan Ultra Mega Power Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sasan Ultra Mega Power Project
Context triple: [Reliance Power, notableProject, Sasan Ultra Mega Power Project]
  • A. Talwandi Sabo Power Project
    Talwandi Sabo Power Project is a major coal-based thermal power plant located in Punjab, India, that significantly contributes to the region’s electricity supply.
  • B. Kamuthi Solar Power Project
    The Kamuthi Solar Power Project is a large-scale photovoltaic power plant in Tamil Nadu, India, known as one of the world’s largest single-location solar installations.
  • C. Port Qasim Coal Power Project
    The Port Qasim Coal Power Project is a major coal-fired power plant in Pakistan developed under the China–Pakistan Economic Corridor to help address the country’s electricity shortages.
  • D. Rana Pratap Sagar Power Station
    Rana Pratap Sagar Power Station is a hydroelectric power facility in Rajasthan, India, that generates electricity using water from the Rana Pratap Sagar Dam on the Chambal River.
  • E. Renusagar Power Plant
    Renusagar Power Plant is a captive coal-based thermal power station in Uttar Pradesh, India, primarily dedicated to supplying electricity to Hindalco Industries’ aluminum operations.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Sasan Ultra Mega Power Project
Target entity description: Sasan Ultra Mega Power Project is a large coal-based thermal power plant in Madhya Pradesh, India, developed as part of the country’s Ultra Mega Power Projects initiative to significantly boost electricity generation capacity.
  • A. Talwandi Sabo Power Project
    Talwandi Sabo Power Project is a major coal-based thermal power plant located in Punjab, India, that significantly contributes to the region’s electricity supply.
  • B. Kamuthi Solar Power Project
    The Kamuthi Solar Power Project is a large-scale photovoltaic power plant in Tamil Nadu, India, known as one of the world’s largest single-location solar installations.
  • C. Port Qasim Coal Power Project
    The Port Qasim Coal Power Project is a major coal-fired power plant in Pakistan developed under the China–Pakistan Economic Corridor to help address the country’s electricity shortages.
  • D. Rana Pratap Sagar Power Station
    Rana Pratap Sagar Power Station is a hydroelectric power facility in Rajasthan, India, that generates electricity using water from the Rana Pratap Sagar Dam on the Chambal River.
  • E. Renusagar Power Plant
    Renusagar Power Plant is a captive coal-based thermal power station in Uttar Pradesh, India, primarily dedicated to supplying electricity to Hindalco Industries’ aluminum operations.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626a67648190af9653832a3aeced completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e65d16f60c81909ba02c0a3429ecae completed April 20, 2026, 5:06 p.m.
Created at: April 11, 2026, 3:29 p.m.