Triple
T19969318
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NH 16 |
E480026
|
entity |
| Predicate | connectsEconomicCorridor |
P77611
|
FINISHED |
| Object | Golden Quadrilateral (via junctions) |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Golden Quadrilateral (via junctions) | Statement: [NH 16, connectsEconomicCorridor, Golden Quadrilateral (via junctions)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Golden Quadrilateral (via junctions) Context triple: [NH 16, connectsEconomicCorridor, Golden Quadrilateral (via junctions)]
-
A.
Golden Quadrilateral
chosen
The Golden Quadrilateral is a major highway network in India that connects the four metropolitan cities of Delhi, Mumbai, Chennai, and Kolkata in a large loop to facilitate faster transport and economic integration.
-
B.
Golden Quadrilateral railway network
The Golden Quadrilateral railway network is a major Indian Railways route system that interconnects key metropolitan cities in a quadrilateral pattern to facilitate high-volume passenger and freight movement.
-
C.
N-40 National Highway
N-40 National Highway is a major road in Pakistan that connects parts of Balochistan, including towns like Dalbandin, to the broader national highway network.
-
D.
North–South and East–West Corridor
The North–South and East–West Corridor is a major Indian highway development project that connects the country’s extremities through long-distance north–south and east–west routes to improve national connectivity and economic integration.
-
E.
East–West Corridor
The East–West Corridor is a major rapid transit line of the Ahmedabad Metro system in Ahmedabad, India, connecting key areas across the city from east to west.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: connectsEconomicCorridor Context triple: [NH 16, connectsEconomicCorridor, Golden Quadrilateral (via junctions)]
-
A.
shareEconomicCorridor
Indicates that two or more entities are connected by, or participate in, the same economic corridor for trade, transport, or development activities.
-
B.
partOfEconomicCorridor
chosen
Indicates that one entity is included within, or constitutes a segment of, a larger defined economic corridor.
-
C.
connectsToInternationalCorridor
Indicates that an entity has a direct linkage or access to an international transportation or trade corridor.
-
D.
locatedInTransportCorridor
Indicates that an entity is situated within a designated transport corridor used for the movement of people or goods.
-
E.
isIndustrialCorridor
Indicates that an area or route is designated and used primarily for industrial activities, facilities, or transportation.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e523c19881909f9197037200dde6 |
completed | April 10, 2026, 11:55 a.m. |
| NER | Named-entity recognition | batch_69e65bc7c2fc81909b89c549a5f99e4c |
completed | April 20, 2026, 5 p.m. |
| PD | Predicate disambiguation | batch_69e537f7e4848190b431a69ec3f1b609 |
completed | April 19, 2026, 8:15 p.m. |
Created at: April 10, 2026, 1:54 p.m.