Triple

T19961688
Position Surface form Disambiguated ID Type / Status
Subject Casa dello Studente, Chieti E479828 entity
Predicate instanceOf P0 FINISHED
Object example of postwar Italian architecture C42482 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: example of postwar Italian architecture
Context triple: [Casa dello Studente, Chieti, instanceOf, example of postwar Italian architecture]
  • A. church building in Italy
    A church building in Italy is a religious structure, often historically and architecturally significant, designed for Christian worship and typically reflecting Italian artistic and cultural traditions.
  • B. Streamline Moderne building
    A Streamline Moderne building is a late Art Deco architectural form characterized by smooth, curving surfaces, horizontal lines, nautical or aerodynamic motifs, and minimal ornamentation that evoke speed and modernity.
  • C. Metabolist architecture
    Metabolist architecture is a postwar Japanese architectural movement that envisioned buildings and cities as dynamic, organic systems capable of growth, change, and renewal through modular, replaceable components.
  • D. Nazi architecture project
    A Nazi architecture project is a large-scale building or urban planning initiative designed under the Third Reich to embody and propagate Nazi ideology through monumental, authoritarian, and neoclassical forms.
  • E. contemporary architecture
    Contemporary architecture is a style of building design characterized by innovative forms, advanced materials and technologies, sustainable practices, and an emphasis on functionality and integration with the surrounding environment.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e523c19881909f9197037200dde6 completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:54 p.m.