Triple

T19958411
Position Surface form Disambiguated ID Type / Status
Subject British Transport Police E479746 entity
Predicate instanceOf P0 FINISHED
Object railway police force C3345 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway police force
Context triple: [British Transport Police, instanceOf, railway police force]
  • A. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • B. police force chosen
    A police force is an organized body of officers empowered by a government to maintain public order, enforce laws, prevent and investigate crime, and protect citizens and property.
  • C. railway training institute
    A railway training institute is a specialized educational facility that provides theoretical and practical instruction to develop the skills and competencies required for various professions within the railway industry.
  • D. railway policy implementation
    Railway policy implementation is the process of translating rail-related laws, regulations, and strategic plans into concrete operational actions, projects, and standards across the railway system.
  • E. rail safety regulator
    A rail safety regulator is an authority responsible for setting, monitoring, and enforcing safety standards and practices across railway systems to protect passengers, workers, and the public.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e523c19881909f9197037200dde6 completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:54 p.m.