Triple

T19944177
Position Surface form Disambiguated ID Type / Status
Subject North Korean economy E479380 entity
Predicate instanceOf P0 FINISHED
Object command economy C1641 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: command economy
Context triple: [North Korean economy, instanceOf, command economy]
  • A. centralized economic planning system chosen
    A centralized economic planning system is a structure in which a central authority makes decisions about the allocation of resources, production targets, and distribution of goods and services across an economy.
  • B. Soviet economic policy
    Soviet economic policy refers to the centrally planned, state-controlled system that directed production, distribution, and investment according to government-determined goals rather than market forces, aiming to rapidly industrialize and achieve socialist objectives.
  • C. capitalist economy
    A capitalist economy is an economic system in which private individuals and firms own the means of production and operate for profit within markets characterized by voluntary exchange, competition, and price signals.
  • D. war economy
    A war economy is an economic system in which a nation’s resources, production, and policies are heavily directed toward supporting military conflict, often involving central planning, rationing, and reallocation of labor and capital from civilian to defense needs.
  • E. Nazi economic authority
    A Nazi economic authority is a state-controlled institution or official body within Nazi Germany responsible for directing, regulating, and coordinating economic activity in line with the regime’s ideological, militaristic, and autarkic goals.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e522a17c819095165d4d24939fd8 completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:54 p.m.