Triple

T19943601
Position Surface form Disambiguated ID Type / Status
Subject Federal Emergency Management Agency floodplain mapping program E479367 entity
Predicate instanceOf P0 FINISHED
Object federal flood hazard mapping program C11955 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: federal flood hazard mapping program
Context triple: [Federal Emergency Management Agency floodplain mapping program, instanceOf, federal flood hazard mapping program]
  • A. flood control agency
    A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
  • B. FEMA facility
    A FEMA facility is a government-operated site used by the Federal Emergency Management Agency to coordinate disaster preparedness, response, recovery, and mitigation activities, including housing personnel, equipment, and emergency operations centers.
  • C. geohazards risk reduction program chosen
    A geohazards risk reduction program is a coordinated set of policies, practices, and interventions designed to identify, assess, and mitigate risks from geological hazards such as earthquakes, landslides, and volcanic eruptions to protect people, infrastructure, and the environment.
  • D. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • E. United States Geological Survey program
    A United States Geological Survey program is an organized initiative or project led by the USGS that conducts scientific research, monitoring, and data dissemination related to the nation’s natural resources, hazards, and landscapes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e522a17c819095165d4d24939fd8 completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:54 p.m.