Triple

T19932447
Position Surface form Disambiguated ID Type / Status
Subject Ouarzazate Solar Power Station E479087 entity
Predicate hasPart P35 FINISHED
Object Noor IV NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Noor IV | Statement: [Ouarzazate Solar Power Station, hasPart, Noor IV]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Noor IV
Context triple: [Ouarzazate Solar Power Station, hasPart, Noor IV]
  • A. Noor II
    Noor II is a large concentrated solar power plant in Morocco that forms a key phase of the Ouarzazate Solar Power Station complex.
  • B. Noor III
    Noor III is a large concentrated solar power tower plant in Morocco that forms a key phase of the Ouarzazate Solar Power Station complex.
  • C. al-Nawādir
    al-Nawādir is a classical Arabic linguistic work by the grammarian Al-Farrāʾ, known for its collection of rare expressions and grammatical observations.
  • D. Omaar
    Omaar is an alternative spelling of the given name Omar, commonly used in various cultures.
  • E. Moneer
    Moneer is a given name, typically an alternative transliteration of the Arabic name Munir, meaning "bright" or "illuminating."
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Noor IV
Target entity description: Noor IV is a photovoltaic solar power plant that forms one of the phases of Morocco’s large Ouarzazate Solar Power Station complex.
  • A. Noor II
    Noor II is a large concentrated solar power plant in Morocco that forms a key phase of the Ouarzazate Solar Power Station complex.
  • B. Noor III
    Noor III is a large concentrated solar power tower plant in Morocco that forms a key phase of the Ouarzazate Solar Power Station complex.
  • C. al-Nawādir
    al-Nawādir is a classical Arabic linguistic work by the grammarian Al-Farrāʾ, known for its collection of rare expressions and grammatical observations.
  • D. Omaar
    Omaar is an alternative spelling of the given name Omar, commonly used in various cultures.
  • E. Moneer
    Moneer is a given name, typically an alternative transliteration of the Arabic name Munir, meaning "bright" or "illuminating."
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e521855c8190b41871700afc8d6a completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e65a14a2348190b41f8e320fe661d6 completed April 20, 2026, 4:53 p.m.
Created at: April 10, 2026, 1:53 p.m.