Triple

T19932433
Position Surface form Disambiguated ID Type / Status
Subject Ouarzazate Solar Power Station E479087 entity
Predicate instanceOf P0 FINISHED
Object concentrated solar power plant C8017 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: concentrated solar power plant
Context triple: [Ouarzazate Solar Power Station, instanceOf, concentrated solar power plant]
  • A. renewable energy power station chosen
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • B. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • C. photovoltaic concept
    A photovoltaic concept is a theoretical or practical design framework that describes how materials and device structures convert light energy into electrical energy through the photovoltaic effect.
  • D. coal-fired power station
    A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
  • E. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e521855c8190b41871700afc8d6a completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:53 p.m.