Triple
T19930579
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Teatro Carlo Felice reconstruction, Genoa |
E479040
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | opera house reconstruction |
C33178
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: opera house reconstruction Context triple: [Teatro Carlo Felice reconstruction, Genoa, instanceOf, opera house reconstruction]
-
A.
former opera house
A former opera house is a building originally constructed and used for staging opera performances that has since been repurposed or no longer functions as an opera venue.
-
B.
United Nations renovation project
The United Nations renovation project is a comprehensive, multi-year initiative to modernize, secure, and sustainably upgrade UN headquarters facilities while preserving their historic and diplomatic functions.
-
C.
architectural reconstruction project
chosen
An architectural reconstruction project is a coordinated effort to research, design, and rebuild a damaged or lost structure to restore its historical, functional, or aesthetic integrity.
-
D.
church rebuilding project
A church rebuilding project is a coordinated effort to restore, reconstruct, or significantly renovate a church’s physical structure and facilities, often driven by structural needs, historical preservation, or community growth.
-
E.
reconstructed church
A reconstructed church is a religious building that has been rebuilt or extensively restored to replicate its original historical form, structure, and appearance after damage, destruction, or significant alteration.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e521855c8190b41871700afc8d6a |
completed | April 10, 2026, 11:55 a.m. |
Created at: April 10, 2026, 1:53 p.m.