Triple
T19923185
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Garden City Skyway |
E478851
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-level bridge |
C958
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-level bridge Context triple: [Garden City Skyway, instanceOf, high-level bridge]
-
A.
bridge approach
A bridge approach is the section of roadway that transitions between the ground and the main span of a bridge, providing a smooth and stable connection for vehicles and pedestrians.
-
B.
highway bridge
chosen
A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
-
C.
bridge operator
A bridge operator is an entity responsible for managing and controlling the operation, safety, and coordination of a bridge’s movable or functional components to ensure efficient and secure passage for users.
-
D.
through-arch bridge
A through-arch bridge is a type of arch bridge in which the deck passes between the arches, with the arch ribs rising above the roadway and connected by vertical or diagonal hangers that support the deck.
-
E.
private bridge
A private bridge is a non-publicly owned structure that spans a physical obstacle, such as a river or road, to provide controlled access exclusively for specific individuals, properties, or organizations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e521855c8190b41871700afc8d6a |
completed | April 10, 2026, 11:55 a.m. |
Created at: April 10, 2026, 1:53 p.m.