Triple
T19921327
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Green Line (Cyprus) |
E478801
|
entity |
| Predicate | alsoKnownAs |
P39
|
FINISHED |
| Object | Attila Line |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Attila Line | Statement: [Green Line (Cyprus), alsoKnownAs, Attila Line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Attila Line Context triple: [Green Line (Cyprus), alsoKnownAs, Attila Line]
-
A.
Attila Line
chosen
The Attila Line is the UN-patrolled buffer zone that divides the island of Cyprus into its northern and southern parts following the 1974 conflict.
-
B.
Alberich Line
The Alberich Line was a German World War I defensive position on the Western Front, forming part of the larger Hindenburg Line system.
-
C.
Brunhild Line
The Brunhild Line was a German World War I defensive position on the Western Front, forming part of the larger Hindenburg Line fortification system.
-
D.
Ferrovienord
Ferrovienord is an Italian railway infrastructure company that manages and develops regional rail lines and stations in the Lombardy region.
-
E.
Bernhardt Line
The Bernhardt Line was a major German defensive fortification system in southern Italy during World War II, forming part of the Winter Line that sought to slow the Allied advance up the Italian peninsula.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e521855c8190b41871700afc8d6a |
completed | April 10, 2026, 11:55 a.m. |
| NER | Named-entity recognition | batch_69e659c564788190a3893fc73fc4922b |
completed | April 20, 2026, 4:52 p.m. |
Created at: April 10, 2026, 1:53 p.m.